Chesapeake's Equipment Enters the Pad Site
August 3, 2011
August 3, 2011
With the Ground "Watered Down,"
the Pad Site (850 feet from the
Joe Pool Lake Dam and Spillway) is prepped
for More Drilling and More Fracking
Water Tanker Truck Leaving the Pad Site
The Grand Prairie, TX Mandatory Water Restrictions Began on Wednesday, August 3, 2011.
Chesapeake must not have read the notice??$$
We continue to worry about all our neighbors in the southernmost parts of Grand Prairie, TX ~ especially those living closest to the Dam and Pad Site (500 feet for our neighbors on Donnie Lane who have never signed fossil fuel leases).
Earthquakes reported to our south and to our north. 4 More Wells Scheduled for Drilling and Fracking at this Site. The ground cracking and shriveling up from the drought.
It's a recipe for all kinds of catastrophic possibilities.
Earthquakes reported to our south and to our north. 4 More Wells Scheduled for Drilling and Fracking at this Site. The ground cracking and shriveling up from the drought.
It's a recipe for all kinds of catastrophic possibilities.
Pray for us, please. Thank you.**
###
No comments:
Post a Comment